Summer=road construction

A sure sign spring summer is fast approaching.

Road work, lots of it across the province and right here in the Okanagan.

Resurfacing work is planned in Kelowna along Highway 97 from Gordon Drive to the junction with Highway 33. 

Close to 4.6 kilometres of roadway will be resurfaced in that area as well as intermittent paving between Abbott Street and Gordon Drive.

A small stretch of Highway 97, about 15 kilometres, will received a facelift from Deep Creek Bridge near Peachland to Glenrosa Road in West Kelowna.

More than 85 million dollars is being invested in highway and side road improvements in the Southern Interior in 2018.